LaurelHighTim
04-10-2009, 05:58 PM
I'm thinking about ordering a Brute Kit in the fall.
I'll need some one to do alot of the work for me.
So with that said, I want to see what you can do.
I want to get some one to do sheet metal work on a TJ Tub Trailer Project for me that will be kinda like this.
http://www.alaska4x4network.com/showthread.php?t=16472&highlight=trailer
I already have the clean tub sections, and they are trimmed very close to where they need to be. I just need some one who is good with fitment/welder/body cement to get this assembled, primered, and painted where needed.
2004 TJ Tub Main Section
1998 TJ Tub Front Section
TJ Frame Piece (need front finished to a V and a hitch)
CJ7 needs installed into the 2004 Section
Front lower edge needs extended/finished
This does not need to be perfect when done, but the Brute will need to be when I order the kit.
Anyone do this kind of work?
Aaron at Monroe on 51 in Pleasant Hills recommended some custom car shop down by the Sheetz and the guy there said that a Brute build was 100 hrs and 10,000 worth of labor. When I asked him about the tub trailer, he said he does not work on junk like that, while leaning against a rusty bling mobile.
Tim
I'll need some one to do alot of the work for me.
So with that said, I want to see what you can do.
I want to get some one to do sheet metal work on a TJ Tub Trailer Project for me that will be kinda like this.
http://www.alaska4x4network.com/showthread.php?t=16472&highlight=trailer
I already have the clean tub sections, and they are trimmed very close to where they need to be. I just need some one who is good with fitment/welder/body cement to get this assembled, primered, and painted where needed.
2004 TJ Tub Main Section
1998 TJ Tub Front Section
TJ Frame Piece (need front finished to a V and a hitch)
CJ7 needs installed into the 2004 Section
Front lower edge needs extended/finished
This does not need to be perfect when done, but the Brute will need to be when I order the kit.
Anyone do this kind of work?
Aaron at Monroe on 51 in Pleasant Hills recommended some custom car shop down by the Sheetz and the guy there said that a Brute build was 100 hrs and 10,000 worth of labor. When I asked him about the tub trailer, he said he does not work on junk like that, while leaning against a rusty bling mobile.
Tim